Skip to content
Contact a Broker
Blog September 17, 2026

Tenant Improvement Allowance: How TI Works

What a tenant improvement allowance is, the other tenant inducements, how TI affects landlords and lenders, and negotiating TI in Colorado.

In commercial real estate, a tenant inducement is something a landlord gives to attract a new tenant or to keep one renewing. A tenant improvement (TI) allowance is a common form: money toward building out the space.

The allowance is negotiated in the lease, alongside other inducements such as free rent. It is one of the commercial lease agreement terms worth negotiating.

This guide explains what TI pays for and how allowances are sized and paid. It also shows how to compare offers and how local markets shape TI in Colorado.

What Tenant Improvements Are

Tenant improvements are the construction and finish work that adapts a leased space to one tenant’s business. They are separate from the building’s base systems, such as the structure, main mechanical systems and common areas, which the landlord usually delivers.

Typical TI work includes:

  • interior walls for offices, conference rooms and work areas;
  • flooring and ceilings;
  • lighting and added electrical capacity;
  • HVAC extensions, restrooms and break rooms;
  • paint, millwork and reception areas;
  • special features such as kitchens, server rooms or labs.

Furniture, equipment and moving costs are usually outside the allowance. Some leases let part of it pay for soft costs such as architecture and engineering fees.

Shell condition sets the scope

How much work a space needs depends on how it is delivered. A cold shell needs the most work, a warm shell less, and move-in-ready space the least. A smaller allowance on finished space can be worth more than a large one on a raw shell.

Types of Tenant Inducements

Tenant inducements include build-out money, free rent, signing bonuses and lease pickups.

  • Improvement allowance: money toward improving the space.
  • Free rent: a period without rent, typically one or two months.
  • Signing bonus: a direct payment to the tenant.
  • Lease pickup: the landlord pays the penalties for breaking the tenant’s old lease.

Depending on its form, an inducement may also be called a concession or rent abatement. Some landlords offer free rent instead of cash, so the tenant funds its own improvements.

How a TI Allowance Is Quoted and Sized

A TI allowance is usually quoted as dollars per rentable square foot. As an illustration, $40 per square foot on a 5,000-square-foot space is a $200,000 allowance.

Four factors tend to drive the size:

  1. Lease term: a longer term gives the landlord more years to recover the cost, so it supports a larger allowance.
  2. Space generation: first-generation space that has never been built out usually gets more than second-generation space.
  3. Tenant strength: a stronger tenant lowers the landlord’s risk of not recovering the cost.
  4. Market conditions: soft markets with high vacancy tend to produce richer allowances.

A larger allowance often comes with a higher base rent. The tenant is still paying for the build-out, just over the term.

Allowance, Turnkey or Amortized TI

There are three main ways to fund a build-out. The lease and its work letter set which one applies.

Structure Who manages the work Who pays overruns Best for
Fixed allowance Tenant Tenant Tenants who want control of design and contractors
Turnkey Landlord, to an agreed spec Landlord Tenants without construction capacity
Amortized TI Either Repaid by tenant through added rent, usually with interest Tenants who need more than the base allowance

The work letter is the exhibit that defines the build-out. It sets the allowance, what it covers, the delivery standard, the draw schedule, the paperwork the tenant must provide, and what happens to unspent money.

Worked example: amortized TI

A build-out costs $60 per square foot, and the base allowance is $40. The landlord agrees to fund the $20 gap and recover it over a five-year term at 8% interest.

  1. The annual payment factor for 8% over five years is about 0.2505.
  2. $20 x 0.2505 = about $5.01 per square foot per year.
  3. The tenant’s rent rises by about $5.01 per square foot for five years, or about $25 in total for a $20 advance.

The figures are an illustration. The real rate and term come from the lease, and the rate matters more than the headline dollar amount.

The TI Process Step by Step

A build-out runs as a small construction project alongside the lease negotiation.

  1. Plan the space: list the rooms, power, plumbing and finishes the business needs.
  2. Price it: get a test-fit drawing and a contractor estimate before asking for an allowance.
  3. Negotiate: settle the allowance, structure, free rent and term together in the letter of intent.
  4. Sign the lease and work letter: confirm delivery condition, approvals, draw rules and deadlines.
  5. Design and permit: the architect prepares drawings, and the landlord approves them before work starts.
  6. Build: the contractor works to the approved plans and schedule.
  7. Close out: collect invoices, lien waivers and the certificate of occupancy, then claim the allowance.
  8. Keep the records: what was built and what it cost matters for later sales, refinancing and estoppel requests.

How the Allowance Gets Paid

A TI allowance is usually a reimbursement, not cash at signing. The landlord pays in draws during construction or in one payment at completion.

To be paid, the tenant typically submits paid invoices, lien waivers and proof of payment. Some leases also require a certificate of occupancy. That timing can leave a tenant funding the work first, so plan cash flow before construction starts.

Most allowances also carry a deadline to finish and claim the money. Unused allowance may be forfeited, credited against rent or applied to soft costs, depending on the lease. Ask for a rent credit for any unspent balance.

Comparing Offers on Net Effective Rent

Net effective rent spreads every concession across the term, so offers with different rent, free rent and TI can be compared on one number.

As an illustration, take a five-year lease at $30 per square foot with three months free and a $40 allowance:

  1. Face rent over five years: $30 x 5 = $150 per square foot.
  2. Less free rent: three months is $7.50, leaving $142.50.
  3. Less the allowance: $142.50 – $40 = $102.50.
  4. Spread over five years: about $20.50 per square foot per year.

This simple version ignores the time value of money and any rent escalations. A broker or analyst will usually discount each year’s cash flow for a fuller comparison.

How TI Affects Landlords and Lenders

A tenant improvement allowance is a real cost the landlord has to fund. Commercial lenders may require reserves at closing for expected tenant improvement and leasing commission costs; see how lenders set loan reserves.

For the owner, TI is a capital cost recovered through rent over the term. Build-outs tailored to one tenant may need rework for the next, which adds to make-ready costs. Highly specialized work, such as a restaurant kitchen or lab, is harder to reuse.

Investors model expected TI, free rent and leasing commissions for each future lease. Those costs sit below net operating income but still reduce cash flow. See modeling re-leasing costs in a pro forma and why TI is not an operating expense in NOI.

Who owns the improvements

In most leases, improvements become part of the building and belong to the landlord, even when the tenant paid for part of them. The lease defines what the tenant may remove, such as trade fixtures, and whether the tenant must restore the space when it leaves.

Tax Treatment in Brief

Tax treatment depends on who pays and how the money is structured. Confirm any plan with a CPA.

  • Improvements a tenant makes: under IRS Publication 946, a tenant can depreciate permanent improvements it makes to rented business property.
  • Qualified improvement property: interior improvements to a nonresidential building fall in a 15-year class. They must be placed in service after 2017 and after the building was first in service. Enlargements, elevators, escalators and the internal structural framework are excluded. The building itself is 39-year property.
  • Retail construction allowances: under Internal Revenue Code section 110, a retail tenant can exclude a landlord’s construction cash from income. The lease must be for 15 years or less. The money must be spent on qualified long-term real property at the space, and both sides must report it.

Negotiating TI in Colorado

In Colorado, a tenant’s leverage on TI depends on the local market.

In Glenwood Springs, two tenants competed for a vacated office floor, which favors the landlord; rents there are in office space cost per square foot in Colorado. Across the Roaring Fork Valley, though, rising office and flex vacancy has given tenants more leverage. Compare commercial lease types and rates in Colorado.

Colorado markets in 2026

Conditions differ sharply from town to town, and so does a tenant’s ability to win concessions.

Market 2026 condition What it means for TI
Denver metro CBRE reports 28.7% total office vacancy in Q2 2026; landlords compete mainly through larger concession packages rather than lower face rents Tenants can push for generous allowances and free rent
Colorado Springs CBRE reports 10.4% office vacancy in H1 2026 and no new office starts since the last delivery in 2021 Most available space is second generation, so check its condition
Glenwood Springs RMCRE reports two tenants competing for one office floor in Q2 2026 Landlords have the upper hand; expect smaller inducements
Basalt RMCRE’s Q2 2026 update calls office inventory constrained, with one office building being converted to a hotel Few options; tenants may trade allowance for term certainty
Steamboat Springs RMCRE’s Q1 2026 update reports a softer office market, with more space shifting to coworking More room to negotiate on standard office space

Tips for Colorado tenants

  1. Price the build-out with a local contractor before signing, so the allowance request is based on real costs.
  2. Ask for the work letter early and match its delivery standard to the plan.
  3. Align the construction schedule with the lease commencement date, and agree what happens if work runs late.
  4. Tie the free-rent period to completion, not to the lease signing date.
  5. Ask for unused allowance to convert into a rent credit.

Mistakes to Avoid

  1. Judging an offer by the allowance alone. A large allowance with higher rent can cost more than a small one with lower rent.
  2. Missing the claim deadline. Late paperwork can forfeit the balance.
  3. Ignoring restoration duties. Removing improvements at lease end can be a large, unplanned cost.
  4. Starting work before the lease is signed. Without a signed work letter, the landlord may not have to pay.
  5. Overlooking interest on amortized TI. Extra build-out money through rent works like a loan.

Frequently Asked Questions

What is a typical tenant improvement allowance?

There is no single figure. The allowance depends on the lease term, the space’s condition, the tenant’s strength and local vacancy. Get quotes for the planned build-out and compare offers on net effective rent.

Is a TI allowance free money?

No. The landlord recovers it through rent over the term, so it is a concession rather than a gift. Larger allowances often come with higher rent or a longer term.

Can unused TI allowance be used for rent?

Only if the lease allows it. Depending on the terms, unused money may be forfeited, credited against rent or used for soft costs. Negotiate this before signing.

Who owns tenant improvements at the end of the lease?

Usually the landlord, because improvements become part of the building. The lease sets what the tenant may remove and whether it must restore the space.

What is the difference between turnkey and a TI allowance?

Under turnkey, the landlord builds the space to an agreed spec and carries overruns. Under an allowance, the landlord pays a fixed amount and the tenant manages the work and pays any overage.


Tenant Representation From RMCRE

When RMCRE brokers act for tenants, they start with the business problem rather than the available space. See tenant representation in Colorado.

Rocky Mountain Commercial Real Estate has joined partner brokers across Colorado mountain towns since 2010. We help tenants weigh allowance, rent and term together, from office space in Glenwood Springs to Durango.

Keep Reading

More from the network

All news

Be the First to Know

Join our buyers list

New listings and quarterly market updates from every RMCRE market in Colorado, sent as they publish.